This article will guide you through bringing an AcuRev meter back online.
Table of Contents
Power Steps
- Check voltage at the AcuRev voltage terminals.
- The power is jumped from one single phase of the metering breaker.
- In image below, V1 phase is jumped over to the L (live) input for power.
- VN should be jumped over to N (neutral)
- The power is jumped from one single phase of the metering breaker.

- Check breaker.
- Confirm connections are solid and correct per diagram.
- Replace meter.
Communication Steps
- Confirm proper RS-485 connections.
- Confirm correct meter addressing on the meter via LCD screen (valid addresses are 111-120).
- Turn metering/power breaker off for at least 2 minutes then turn on and check meter communication again.